Haber-Bosch with Air Separation Unit¶
This dataset contains techno-economic data on Haber-Bosch synthesis plants with an Air-Separation Unit (ASU).
Aggregated parameters¶
All data in this dataset can be aggregated via the NOSLAG workflow, which yields the following parameters:
Raw data¶
The table below contains the raw data contained in this dataset. The raw data has not be normalised or harmonised in any way and should closely resemble the data as it is reported by the respective sources. You can also find this data in the GitHub repo in this file: posted/database/tedfs/Tech/Haber-Bosch with Air Separation Unit.csv
| Loading ITables v2.9.1 from the internet... (need help?) |
| ⓘsource | source_detail | component | period | variable | reference_variable | value | uncertainty | unit | reference_value | reference_unit | comment |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ArnaizDelPozo-2022 | Supplementary Information, Table 2 | # | 2022 | CAPEX | Output Capacity|Ammonia | 643.0 | EUR_2020 | 1.0 | kW_NH3_LHV | As stated in Section 2.4.1, the ammonia output of the plant is measured in units of its lower heating value. | |
| Ikaheimo-2018 | Page 7, Table 3 | # | 2018 | CAPEX | Output Capacity|Ammonia | 870.0 | EUR_2018 | 1.0 | kW_NH3_LHV | Cost basis not given in the paper, assumed to be 2018. | |
| Grahn-2022 | Table 7 | # | 2025 | CAPEX | Output Capacity|Ammonia | 1400 | EUR_2019 | 1.0 | kW_NH3_LHV | Error in Table 7, units are given in EUR/MW. Table 3 contradicts this | |
| Grahn-2022 | Table 7 | # | 2040 | CAPEX | Output Capacity|Ammonia | 850 | EUR_2019 | 1.0 | kW_NH3_LHV | Error in Table 7, units are given in EUR/MW. Table 3 contradicts this | |
| ArnaizDelPozo-2022 | Supplementary Information, Table 2 | # | 2022 | OPEX Fixed Relative | 3.0 | percent | |||||
| Grahn-2022 | Table7 | # | 2025 | OPEX Fixed Relative | 4.0 | percent | |||||
| Grahn-2022 | Table7 | # | 2040 | OPEX Fixed Relative | 4.0 | percent | |||||
| Ikaheimo-2018 | Page 7, Table 3 | # | 2018 | OPEX Fixed | Output Capacity|Ammonia | 17.0 | EUR_2018/year | 1.0 | kW_NH3_LHV | Cost basis not given in the paper, assumed to be 2018. | |
| ArnaizDelPozo-2022 | Supplementary Information, Table 2 | # | 2022 | OPEX Variable | Output|Ammonia | 0.6 | EUR_2020 | 1.0 | MWh_NH3_LHV | Includes Ammonia catalyst and make up water. Wrongly reported as EUR/kWh, is EUR/MWh according to the Authors' excel worksheets. As stated in Section 2.4.1, the ammonia output of the plant is measured in units of its lower heating value. | |
| Matzen-2015 | Page 9 / Table 13 | # | 2015 | Input|Hydrogen | Output|Ammonia | 0.178 | t_H2 | 1.0 | t_NH3 | ||